Let be a planar polygonal environment with vertices, and let denote unit-square robots translating in . Given source and target placements for each robot, we wish to compute a collision-free motion plan , i.e., a coordinated motion for each robot along a continuous path from to so that robot does not leave or collide with any other . Moreover, we additionally require that minimizes the sum of the path lengths; this variant is known as . Even computing a feasible motion plan for unit-square robots in a polygonal environment is {\textsf PSPACE}-hard. For , let denote the cost of a min-sum motion plan for square robots of radius each from to . Given a parameter , we present an algorithm for computing a coordinated motion plan for unit radius square robots of cost at most , which improves to if , that runs in time , where . Our result is the first polynomial-time bicriteria -approximation algorithm for any optimal multi-robot motion planning problem amidst obstacles for a constant value of . The algorithm also works even if robots are modeled as congruent disks.

生成讲解博客的中文版本

生成AI智能校验的中文版本