Engineering change orders (ECOs) in late stages make minimal design fixes to recover from timing shifts due to excessive IR drops. This paper integrates IR-drop-aware timing analysis and ECO timing optimization using reinforcement learning (RL). The method operates after physical design and power grid synthesis, and rectifies IR-drop-induced timing degradation through gate sizing. It incorporates the Lagrangian relaxation (LR) technique into a novel RL framework, which trains a relational graph convolutional network (R-GCN) agent to sequentially size gates to fix timing violations. The R-GCN agent outperforms a classical LR-only algorithm: in an open 45nm technology, it (a) moves the Pareto front of the delay-power tradeoff curve to the left (b) saves runtime over the prior approaches by running fast inference using trained models, and © reduces the perturbation to placement by sizing fewer cells. The RL model is transferable across timing specifications and to unseen designs with fine tuning.

生成讲解博客的中文版本

生成AI智能校验的中文版本