加载中…
Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory’s accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available and software that uses obsolete frameworks. The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. An overview of the ACORN Project and a summary of recent research and development activities will be presented.

生成讲解博客的中文版本

生成AI智能校验的中文版本