加载中…
We investigate the residual throughput penalty due to ISRS, after power-optimization, in multiband systems. We show it to be mild. We also revisit the launch power optimization 3-dB rule. We find that using it is possible but not advisable due to increased GSNR non-uniformity.

生成讲解博客的中文版本

生成AI智能校验的中文版本