加载中…
The paper demonstrates the Windows data collectordevelopment process with the built back-end from the require-ments gathering stage till the implementation and testing phase.Each phase throughout the development life cycle of the systemis defined in details. The whole system idea and the objectivesbehind developing this kind of framework is described in earlierpapers that creates the importance of introducing the backgroundbefore reading this paper. The detailed information about thedata collector features that are provided and their appropriatetesting types, documentation are demonstrated thoroughly. Be-sides, the process of development includes both design and overallsystem architecture description.

生成讲解博客的中文版本

生成AI智能校验的中文版本