The need for Enhanced Frequency Response (EFR) is expected to increase
significantly in future low-carbon Great Britain (GB) power system. One way to
provide EFR is to use power electronic compensators (PECs) for point-of-load
voltage control (PVC) to exploit the voltage dependence of loads. This paper
investigates the techno-economic feasibility of such technology in future GB
power system by quantifying the total EFR obtainable through deploying PVC in
the urban domestic sector, the investment cost of the installment and the
economic and environmental benefits of using PVC. The quantification is based
on a stochastic domestic demand model and generic medium and low-voltage
distribution networks for the urban areas of GB and a stochastic unit
commitment (SUC) model with constraints for secure post-fault frequency
evolution is used for the value assessment. Two future energy scenarios in the
backdrop of 2030 with smart' and non-smart’ control of electric vehicles and
heat pumps, under different levels of penetration of battery energy storage
system (BESS) are considered to assess the value of PEC, as well as the
associated payback period. It is demonstrated that PVC could effectively
complement BESS towards EFR provision in future GB power system.