Spanner constructions focus on the initial design of the network. However, networks tend to improve over time. In this paper, we focus on the improvement step. Given a graph and a budget , which edges do we add to the graph to minimise its dilation? Gudmundsson and Wong [TALG’22] provided the first positive result for this problem, but their approximation factor is linear in . Our main result is a -bicriteria approximation that runs in time, for all . In other words, if is the minimum dilation after adding any edges to a graph, then our algorithm adds edges to the graph to obtain a dilation of . Moreover, our analysis of the algorithm is tight under the Erdős girth conjecture.

生成讲解博客的中文版本

生成AI智能校验的中文版本