This work presents a general framework for the operationally driven optimal siting and sizing of battery energy storage systems in power transmission networks, aimed at enhancing their resource adequacy. The approach considers multi-period planning horizons, enforces network constraints at high temporal resolution, and targets large-scale meshed systems. The resulting computationally complex mixed-integer non-linear programming problem is reformulated as a mixed-integer second-order cone programming problem and solved via Generalized Benders Decomposition, with feasibility cuts enabling congestion management and voltage regulation under binding network limits. A tailored heuristic recovers an alternating-current power-flow-feasible operating point from the relaxed solution. The proposed formulation is parallelizable, yielding excellent computational performance, while featuring rigorous guarantees of convergence.

生成讲解博客的中文版本

生成AI智能校验的中文版本