加载中…
We consider the following special case of minimizing makespan. A set of jobs and a set of machines are given. Each job can be scheduled on a machine from a subset of . The processing time of is the same on all machines in The jobs are of two sizes, namely (big) and (small). We present a polynomial-time algorithm that approximates the value of the optimal makespan within a factor of 1.883 and some further improvements when every job can be scheduled on at most two machines.

生成讲解博客的中文版本

生成AI智能校验的中文版本