加载中…
A Bayesian estimation of a GARCH model is performed for US Dollar/Japanese Yen exchange rate by the Metropolis-Hastings algorithm with a proposal density given by the adaptive construction scheme. In the adaptive construction scheme the proposal density is assumed to take a form of a multivariate Student’s t-distribution and its parameters are evaluated by using the sampled data and updated adaptively during Markov Chain Monte Carlo simulations. We find that the autocorrelation times between the data sampled by the adaptive construction scheme are considerably reduced. We conclude that the adaptive construction scheme works efficiently for the Bayesian inference of the GARCH model.

生成讲解博客的中文版本

生成AI智能校验的中文版本