加载中…
In this report the test beam requirements for the vertex detector and the tracking detector for ILC are discussed. It focuses on the infrastructure needs of the different subsystems. In the second part of this summary the ideas about future infrastructure above the immediate needs are summarised.

生成讲解博客的中文版本

生成AI智能校验的中文版本